Select Page
Coos Bay Channel Modification (Section 204(f)/408 Report)

Coos Bay Channel Modification (Section 204(f)/408 Report)

As part of an effort to modify the Lower Coos Bay Navigation Channel to accommodate larger deep draft vessels, the Port of Coos Bay contracted with DEA to lead the FS/EIS process, consisting of four phases: public scoping, detailed technical studies, draft FS/EIS development, and final FS/EIS development and approval.

Space Shuttle Endeavour Route and Conflict Mapping

Space Shuttle Endeavour Route and Conflict Mapping

DEA’s 3D mobile laser scanning system provided a dense point cloud of data about the planned route for the move of the Space Shuttle Endeavour from the Los Angeles International Airport to its final home, the California Science Center in Exposition Park.

Smith-Bybee Natural Resource Management Plan

Smith-Bybee Natural Resource Management Plan

DEA’s team of planners, biologists, engineers and landscape architects collaborated to develop a 10-year management plan for the Smith Bybee Wetlands Natural Area, one of the largest urban natural systems in the country.

Copco #2 115/69 kV Substation

Copco #2 115/69 kV Substation

DEA was contracted to prepare a scope and to design the rebuilding of an existing 115 kV/69 kV yard from a radial bus configuration to an initial ring-bus configuration with an ultimate break-and-a-half configuration.

Crissey Field Park and Welcome Center

Crissey Field Park and Welcome Center

Crissey Field is a new 40-acre beachfront park between the Pacific Coast Highway 101 and the ocean beach, south of Brookings, Oregon. The center was carefully designed to fit into the natural landscape and incorporates many sustainable design features.