Current Design
Design Information
The Phase 1 map has been updated since the Open House to reflect the addition of 4' bike lanes along Saltzman between Cornell and Dogwood going north and southbound. To meet the bike lane needs, the two northbound lanes have been reduced in width from 12' to 11'.
- Phase I Strip Map (PDF)
- Phase I Profile (PDF)
- Phase II Strip Map (PDF)
- Phase II Profile (PDF)
- Draft Staging Plan (PDF)
Project Requirements
Project Requirements (PDF)
For more information, contact:
Matt Costigan, Engineering Project Manager
matthew_costigan@co.washington.or.us or (503) 846-7825



