Draft Design


Design Information


The Phase 1 map has been updated since the Open House to reflect the addition of 4’ bike lanes along Saltzman between Cornell and Dogwood going north and southbound. To meet the bike lane needs, the two northbound lanes have been reduced in width from 12’ to 11’.

Project Requirements

Project Requirements (PDF)

For more information, contact:
Matt Costigan, Engineering Project Manager
matthew_costigan@co.washington.or.us or (503) 846-7825